免费午夜不卡毛片-亚洲一区二区三区偷拍女-99精品日韩一区二区三区-亚洲欧美另类天堂-日韩av免费精品-一本色道久久亚洲av蜜桃-欧美麻豆精品久久久久

Jiangmen hardware accessories factory analyzes its mold processing process arrangement

2019-12-29 1634

  Mold making refers to the processing of forming and blank making tools, in addition to shear mold and die-cutting mold. Generally, the mold has two parts: upper mold and lower mold. The steel plate is placed between the upper and lower dies to realize the material forming under the action of the press. When the press is opened, the workpiece determined by the die shape will be obtained or the corresponding waste materials will be removed. As small as electronic connector, as large as the automobile dashboard, the workpiece can be molded with mold. Progressive die refers to a set of die which can automatically move the workpiece from one station to another and get the forming parts at the last station. Die processing technology includes: cutting die, blanking die, compound die, extrusion die, four slide die, progressive die, stamping die, die cutting die, etc.

  Process flow arrangement

  1. Bottom surface processing, processing quantity guarantee;

  2. Casting blank datum alignment, 2D and 3D mold surface allowance inspection;

  3. Rough machining of 2D and 3D profile, non installation non working plane (including safety platform surface, buffer installation surface, pressing plate plane and side datum plane);

  4. Before semi finishing, the side datum should be aligned correctly to ensure the accuracy;

  5. Semi finish machining of 2D and 3D profile, finish machining of all kinds of installation working surfaces (including limit block installation surface and contact surface, insert installation surface and back side, punch installation surface, waste cutter installation surface and back side, spring installation surface and contact surface, all kinds of travel limit working surface, wedge installation surface and back side), semi finish machining of all kinds of guide surfaces and guide holes, leaving allowance for finish machining process Datum hole and height datum, and record data;

  6. Check and recheck the machining accuracy;

  7. Fitter setting process;

  8. Before finishing, align the reference surface of the process reference hole and check the allowance of the insert;

  9. Finish machining profile 2D, 3D, side punching profile and hole position, finish machining process reference hole and height reference, finish machining guide surface and guide hole;

  10. Check and recheck the machining accuracy.

  Jiangmen hardware accessories factory http://m.molizone.cn//


无码一区二区三区亚洲人妻 | 一级卡片亚洲精品发布 | 国产h视频在线观看免费 | 国产AV日韩一区二区三区精品 | 亚洲精品视频在线免费观看 | 欧美黑人疯狂性受XXXXX喷水 | 在线观看国产精品女主播 | 欧美日韩永久久一区二区三区 | 麻豆AV一区二区三区 | 日本产品和韩国产品哪个好99 | 国产精品久久久天天影视香蕉 | 亚洲中文字幕无码久久1 | 中国一级特黄**毛片试看 | 欧美成人久久一级c片免费 免费视频国产在线观看 | 玩弄chinese丰满人妻videos | 欧美乱色伦图片区小说 | 加勒比色综合久久久久久久久 | 亚洲国产日韩欧美高清片a 黄色三级网站免费 | 最近中文在线字幕在线观看 | 久久窝窝国产精品午夜看片 | 4455vw亚洲毛片 | 毛片视频在线免费观看 | 国产精品人人爽人人做Av片 | 农村妇女牲交一级毛片 | 成人网站免费大全日韩国产 | 国产成+人欧美+综合在线观看 | 色伦专区97中文字幕 | 日韩福利视频精品专区 | 五月丁香啪啪激情综合5109 | 欧美精品大香伊蕉在人线 | 性短视频在线观看免费不卡流畅 | AV无码久久久久不卡网站毛片 | 日韩精品久久久肉伦网站 | jizz国产精品网站 | 久久自慰流水喷白浆免费看 | 国产内射爽爽大片 | 在线视频一区二区三区不卡 | 国产成都一二三四区 | 国产综合视频在线观看一区 | 最近韩国日本免费高清观看 | 国产精品性做久久久久久 |